A supplier confirmation can repeat almost the entire purchase order while changing just one date, discount or quantity. That detail affects availability, cost and subsequent invoice checks. This guide follows the purchasing cycle and explains how to review a confirmation before updating the ERP.
Which order confirmation are we checking?
The perspective is the purchasing company. Its purchasing team issues a purchase order and receives a supplier confirmation. The task is to compare what the supplier commits to deliver with the request: item, quantity, price, discounts and dates.
This differs from a customer order received by a company when it sells, and from an outgoing confirmation generated by its own ERP. Separating those situations keeps the checks focused on the right document. A supplier confirmation can also arrive in a different email conversation, so the match cannot depend on the email thread alone.
Checks to complete before updating the ERP
Identify the correct purchase order before matching its lines. Similar descriptions are not enough when variants, different item codes or several open orders exist for the same supplier. An uncertain match should remain available for review.
| Data | Check | Question to resolve |
|---|---|---|
| Purchase order | Supplier, reference and open order | Does the confirmation refer to this PO? |
| Item | Code, description, variant and line | Is this the requested material and pack? |
| Quantity | Ordered, confirmed and still unconfirmed | Is this a complete or partial confirmation? |
| Price and discounts | Comparable units and commercial terms | Does the net price use the same basis? |
| Delivery | Requested and confirmed dates per line | Which part of the order will arrive later? |
| Charges | Existing header total and proposed amount | Is freight already included in the PO? |
An example with partial quantities and changed dates
Illustrative example using fictional data: PO 517 requests 120 VL-24 valves at €4.80 each for 10 December. Confirmation CO-778 specifies 80 for 14 December and 40 for 21 December at the same price. The quantities add up, but the availability schedule changes.
The check should show both dates and their relationship to the ordered line. Treating the first 80-unit confirmation as a permanent reduction of the order to 80 would be incorrect. The remaining 40 units have not been received either. A price change would require a separate decision: accept it, request clarification or negotiate.
Purchasing checks the planning impact, decides how to handle the variation and records the accepted condition in the ERP. That keeps the basis for subsequent receiving and invoice checks consistent.
Multiple confirmations and freight: avoid automatic addition
One PO can receive several partial confirmations, including several documents in the same email. If each repeats the same total freight charge, adding it once per confirmation or line inflates the order cost.
For example, confirmations for 80 and 40 units both show €25 freight. Before proposing €50, establish whether the documents repeat one header charge or describe two separately chargeable shipments. The buyer compares the proposal with the amount already recorded on the PO and decides the final total. Counting documents does not resolve this ambiguity.
When a person must decide what the difference means
Rules can detect a difference; they cannot independently decide whether a delay is acceptable for a particular job. Even an earlier delivery can need review if the warehouse cannot receive the goods at that time.
- A missing PO reference or more than one plausible open order.
- A different item code, substitution or changed pack size.
- A partial quantity or several delivery dates for one line.
- A price quoted per pack rather than per individual unit.
- A discount, freight charge or commercial note that changes the total.
- A later confirmation correcting a version already processed.
What Typelens can automate
Typelens reads the received confirmation and compares its data with the purchase order configured in the workflow. The aim is to reduce retyping and expose differences before the ERP is updated. A person retains the decision on variations that need approval.
Coverage depends on available data, agreed rules and the ERP integration. A useful demonstration starts with representative confirmations and orders, including exceptions, and verifies the update result as well. Reading a PDF correctly is not the same as completing the entire process correctly.
Explore Typelens supplier order confirmation automation
Why the check matters after confirmation
Once a variation is accepted, the ERP should reflect the agreed terms. Otherwise invoice checks compare the supplier’s requested price with an outdated order and create an avoidable discrepancy.
A confirmation is not proof of delivery. Receiving has its own checks, and a delivery note must be distinguished from the quantity actually accepted. An invoice can later cover several deliveries and documents. Keeping the original request, confirmation and accepted terms linked makes subsequent checks clearer.
Connect confirmations with PO, delivery note and invoice matching
How to run a useful pilot
Choose a sample covering different suppliers and formats, partial confirmations, changed dates and at least one ambiguous match. Record the correct PO, expected values and final decision for each case. Use documents authorised for the pilot or examples built with synthetic data.
Measure correctly matched lines, detected differences, false alarms, review minutes and successful ERP updates. Separate document-reading time from total time to resolve the case. That is how to establish whether work becomes easier without turning an extraction percentage into a promise of complete autonomy.